|
|
|
Slide #3: Installing the concrete blocks
|
 |
- Install the concrete blocks, e.g., 8"X8"X16" [open-faced up] along the edges where register vents will be installed.
- Locate the position of the air return/furnace to determine the location of the air supply channel.
- Install the blocks along the air supply channel with the holes aligned north-south.
|
|
|
|