Main Index

Convective Air Slab

Slide #6: Air supply and air register channels

  1. Cut and install -1/2" concrete board in the bottom and the ends of the air supply channels and air register channels.
  2. Insure the concrete board is placed with the concrete side facing the channel to qualify for a concrete plenum.
  3. Tape the concrete board at the seams.

Gallery Index