Step 9: taping gaps in the blocks

A.

Determine to what extent gaps in the blocks exceed 1/4" inch that are aligned north-south.

B.

Tape gaps in blocks, with 3" duct tape to insure poured concrete does not block air movement.

C.

Tape around plumbing and electrical conduits, and the furnace can.