A.
Determine to what extent gaps in the blocks exceed 1/4" inch that are aligned north-south.
B.
Tape gaps in blocks, with 3" duct tape to insure poured concrete does not block air movement.
C.
Tape around plumbing and electrical conduits, and the furnace can.